Hotel "Kakadu" town of Kavarna 12

Design and construction of water cooling and heating installations with heat pump water cooling unit with total cooling capacity 70kW and heating power 75kW, indoor units restaurant – ceiling convectors type of cassette, indoor units hotel part – convectors high wall installation, energy saving multistage ventilation and air conditioning via air duct With a total flow rate of 8,000m3 / h, a waste heat utilization system.
Head office

“Салтанат” 59 офис 1

9005, гр. Варна България

office@chill-commerce.com

 052 300945